1. <bdo id="xmmda"></bdo> <nobr id="xmmda"><optgroup id="xmmda"><big id="xmmda"></big></optgroup></nobr>
      <track id="xmmda"></track>
    2. <menuitem id="xmmda"><dfn id="xmmda"><thead id="xmmda"></thead></dfn></menuitem>
      Welcome to xxxxxx Co., Ltd
      CN EN

      New pipeline Manufacturer & amp; Customized overall solution

      Integrated service provider of fluid pipeline system engineering

      Service hotline:

      400-000-0000

      + Wechat number:wechat number

      Add wechat friends to learn more about products.

      Your location: Home > 產品展示 > PPR water supply pipe

      PPR water supply pipe 001

      During loading and unloading, the materials shall be protected from damage. It is strictly prohibited to push the grille pipe directly from the carriage or higher place. The materials should be transported directly from the transfer station to the construction site. If it is necessary to set up a temporary pipe stacking site, the temporary pipe stacking site shall be selected by the construction u

      National hotline

      13893689311

      Details
      During loading and unloading, the materials shall be protected from damage. It is strictly prohibited to push the grille pipe directly from the carriage or higher place. The materials should be transported directly from the transfer station to the construction site. If it is necessary to set up a temporary pipe stacking site, the temporary pipe stacking site shall be selected by the construction unit. The pipe stacking site shall be set at a place convenient for construction as far as possible, and the site shall be flat and compacted.
      国产亚洲精久久无码一区二区,性色AV无码中文AV有码vr,极品少妇av无码无码免费播放,无码乱码AV天堂一区二区

      1. <bdo id="xmmda"></bdo> <nobr id="xmmda"><optgroup id="xmmda"><big id="xmmda"></big></optgroup></nobr>
        <track id="xmmda"></track>
      2. <menuitem id="xmmda"><dfn id="xmmda"><thead id="xmmda"></thead></dfn></menuitem>